NEWS AND REPORTS. » Archive for 2006 :

Boardman Canal and Gold Run Pipeline

boardman-phase-3-and-4-initial-study-cover Initial Study / Mitigated Negative Declaration (November 2006) The Boardman Canal and Gold Run Pipeline Improvement Project (Proposed Project) is located near the towns of Gold Run and Dutch Flat, about 20 miles northeast of the city of Auburn, California.  The Placer County Water Agency (PCWA) operates [...] READ

Stagecoach Vineyards

stagecoach-initial-study-cover Initial Study (August 2006) Stagecoach Vineyards Erosion Control Plan Application (ECPA) #P06-0042-ECPA proposes to develop approximately 90 acres of new vineyard and associated vineyard avenues within 107 gross acres. Activities included in this development process include the removal of existing [...] READ

Guenoc Vineyards

guenoc-draft-eir-cover Water Rights Modification Project / DEIR (July 2006) This Draft Environmental Impact Report (DEIR) has been prepared to provide the public and interested public agencies with information about the potential environmental effects of the proposed Guenoc Water Right Modification Project (Proposed Project). [...] READ

Rosenthal Vineyard

rosenthal-initial-study-cover Water Right Applications Project - Initial Study (March 2006) The Rosenthal project is located near Middletown in Lake County, California. The project consists of two water right applications that would allow for the direct diversion and diversion to storage of water in three onstream reservoirs for [...] READ

Gold Run Pipeline Near Term Improvement Project

goldrun-initial-study-cover Initial Study/Mitigated Negative Declaration (March 2006) The primary purpose of the Proposed Project is to replace a deteriorating portion of the Gold Run pipeline with approximately 3,800 feet of pipeline in order to eliminate the risk of future service outages from breaks in the pipe.  The Proposed [...] READ