Draft EIR (November 2007)
The project proposes to develop approximately 90 acres of new vineyard within 107 gross acres on the 1,130-acre Stagecoach Vineyards property. The project includes earthwork and grading activities associated with soil cultivation, installation and maintenance of drainage [...] READ
NEWS AND REPORTS » Archive for 2007 :
Stagecoach Vineyards
November 1, 2007
Cooley Ranch Vineyards
August 1, 2007
Initial Study/Mitigated Negative Declaration (August 2007)
The proposed project involves three separate water right applications, each to develop water storage reservoirs and vineyards in separate geographical areas of the Cooley Ranch project area. Application 31304 includes the development of 65 [...] READ
Circle S Ranch Vineyards – Initial Study
June 1, 2007
Initial Study (June 2007)
The Circle S Ranch LLC Erosion Control Plan Application (ECPA) #P06-01508-ECPA proposes the development of 337 net acres of vineyard within 411 gross acres disturbed on the 1,593-acre Circle S Ranch. Activities associated with this development process include the removal [...] READ
Sleepy Hollow Vineyards
March 1, 2007
Initial Study/Mitigated Negative Declaration (March 2007)
The Sleepy Hollow project is located on Lakeville Highway in Sonoma County, California. The project includes the addition of 115 acres of vineyard to the existing 60-acre place of use authorized under an existing water right permit, and an [...] READ
