NEWS AND REPORTS. » Archive for IS :

Carmichael Water District Final Initial Study / MND

Carmichael Water District Final Initial Study / MND This Initial Study has been prepared by AES and the Carmichael Water District in accordance with the California Environmental Quality Act (CEQA) to examine the potential environmental effects associated with construction of the American River Pipeline Conveyance Project (Project). The Project consists [...] READ

City of Shasta Lake Initial Study

City of Shasta Lake Initial Study Cover This Initial Study has been prepared by AES and the City of Shasta Lake in accordance with the California Environmental Quality Act (CEQA) to examine the potential environmental effects associated with construction and operation of the proposed Wastewater Treatment Facility (WWTF) Upgrade Project. The [...] READ

Clearlake Oaks County Water District Water and Wastewater Infrastructure Rehabilitation

Clearlake Oaks County Water District Water and Wastewater Infrastructure Rehabilitation These Initial Studies have been prepared by the Clearlake Oaks County Water District (CLOCWD) in accordance with the California Environmental Quality Act (CEQA) to examine the potential environmental effects associated with the construction and operation of proposed water and wastewater infrastructure [...] READ

Winchell Cove Final Environmental Assessment / Initial Study

Winchell Cove Final EA/IS This Environmental Assessment/Initial Study (EA/IS) has been jointly prepared by AES and the Bureau of Reclamation (Reclamation) as the lead federal agency and Fresno County (County) as the lead state agency in accordance with the California Environmental Quality Act (CEQA) and the National Environmental [...] READ

Millerton Road Initial Study

Millerton Road IS This Initial Study has been prepared by AES and the County of Fresno (County) in accordance with the California Environmental Quality Act (CEQA) to examine the potential environmental effects associated with construction and operation of the proposed Millerton Road Improvement Project. The Proposed [...] READ

Walt Ranch Vineyard

walt-ranch-initial-study-cover Initial Study (October 2012) Napa County has initiated an EIR process for the development of 356 acres of vineyard on the approximately 2,300-acre Walt Ranch. Vineyard development activities include removal of brush, trees and associated vegetation in proposed clearing limits, blasting, ripping to [...] READ

Marin Country Club Water Facility Project

marin-country-club-initial-study-cover Initial Study / Mitigated Negative Declaration (September 2010) The Marin Country Club (MCC) Water Facility Project proposes the construction of an onstream pond having a surface area of about 1.2 acres with a capacity of four acre-feet (af). The pond would be located on the golf course at the MCC [...] READ

Boardman Canal Pipeline Relocation at Pacific Avenue Project

boardman-initial-study-cover Initial Study/Mitigated Negative Declaration (December 2008) The Boardman Canal Pipeline Relocation at Pacific Avenue Project addresses the potential failure of a section of the Boardman Canal Canal under Pacific Heights apartment complex in Auburn, California.  The Placer County Water Agency (PCWA) [...] READ

Teixeira

teixeira-initial-study-cover Initial Study/Mitigated Negative Declaration (March 2008) The Teixeira project is located six miles east of Petaluma in Sonoma County, California. The project includes the diversion of 164 acre-feet of water per annum to storage from an Unnamed Stream tributary to the Petaluma River thence the San [...] READ

Canebrake Vineyards

canebrake-initial-study-cover Initial Study/Mitigated Negative Declaration (March 2008) The Canebrake Vineyards project is located off U.S. Highway 101 in Mendocino County, California. The project includes the diversion of 10 acre-feet of water per annum to storage from Forsythe Creek tributary to the West Fork of the Russian [...] READ

Lemon Street Channel Project

lemon-street-ismnd-cover Initial Study/Mitigated Negative Declaration (February 2008) This document examines the potential environmental effects of the proposed Lemon Street Channel Flood Reduction and Habitat Enhancement Project (Proposed Project). The Proposed Project would reduce flooding of the area surrounding the Lemon [...] READ

Cooley Ranch Vineyards

cooley-ranch-initial-study-cover Initial Study/Mitigated Negative Declaration (August 2007) The proposed project involves three separate water right applications, each to develop water storage reservoirs and vineyards in separate geographical areas of the Cooley Ranch project area. Application 31304 includes the development of 65 [...] READ

Circle S Ranch Vineyards – Initial Study

circle-s-final-initial-study-cover Initial Study (June 2007) The Circle S Ranch LLC Erosion Control Plan Application (ECPA) #P06-01508-ECPA proposes the development of 337 net acres of vineyard within 411 gross acres disturbed on the 1,593-acre Circle S Ranch.  Activities associated with this development process include the removal [...] READ

Sleepy Hollow Vineyards

sleepy-hollow-initial-study-cover Initial Study/Mitigated Negative Declaration (March 2007) The Sleepy Hollow project is located on Lakeville Highway in Sonoma County, California.  The project includes the addition of 115 acres of vineyard to the existing 60-acre place of use authorized under an existing water right permit, and an [...] READ

Boardman Canal and Gold Run Pipeline

boardman-phase-3-and-4-initial-study-cover Initial Study / Mitigated Negative Declaration (November 2006) The Boardman Canal and Gold Run Pipeline Improvement Project (Proposed Project) is located near the towns of Gold Run and Dutch Flat, about 20 miles northeast of the city of Auburn, California.  The Placer County Water Agency (PCWA) operates [...] READ

Stagecoach Vineyards

stagecoach-initial-study-cover Initial Study (August 2006) Stagecoach Vineyards Erosion Control Plan Application (ECPA) #P06-0042-ECPA proposes to develop approximately 90 acres of new vineyard and associated vineyard avenues within 107 gross acres. Activities included in this development process include the removal of existing [...] READ

Rosenthal Vineyard

rosenthal-initial-study-cover Water Right Applications Project - Initial Study (March 2006) The Rosenthal project is located near Middletown in Lake County, California. The project consists of two water right applications that would allow for the direct diversion and diversion to storage of water in three onstream reservoirs for [...] READ

Gold Run Pipeline Near Term Improvement Project

goldrun-initial-study-cover Initial Study/Mitigated Negative Declaration (March 2006) The primary purpose of the Proposed Project is to replace a deteriorating portion of the Gold Run pipeline with approximately 3,800 feet of pipeline in order to eliminate the risk of future service outages from breaks in the pipe.  The Proposed [...] READ