Marin Country Club Water Facility Project
November 15, 2010

Initial Study / Mitigated Negative Declaration (September 2010)

The Marin Country Club (MCC) Water Facility Project proposes the construction of an onstream pond having a surface area of about 1.2 acres with a capacity of four acre-feet (af). The pond would be located on the golf course at the MCC on the Arroyo San Jose watercourse, tributary to Novato Creek thence San Pablo Bay. The proposed pond is located within a chain of six existing ponds on the golf course and is a component of the project named in Water Right Applications 31655 and 31656. The Water Right Applications seek the approval of the diversion of up to 85 af per year for storage in the seven onstream ponds (six existing and one proposed). Water would be used on 95 acres at the MCC for irrigation and industrial purposes.

Posted in 2010, IS, Reports